ENVIRONMENTAL PERMITTING

Silt Sock
Silt Sock

A silt sock is installed at a site for erosion and sediment control.

Big Run Landslide
Big Run Landslide
Water Storage Tanks
Water Storage Tanks

Design of 0.5 MGD Bolted Steel Water Tank to Service a Public Water Supply

E&S Controls
E&S Controls

PA DEP Permitted E&S Controls for Construction of a Parking Lot

E&S Controls
E&S Controls

PA DEP Permitted E&S Controls for Construction of a Bridge

E&S Controls
E&S Controls

PA DEP Permitted Compost Filter Sock E&S Control Measure for Site Development

The Right Permits at the Right Time

 

RAR Engineering Group works directly with state and local regulatory agencies to efficiently secure all necessary permits for our clients.  These permits include:

  • Erosion and Sediment Control Plans

  • Stormwater Management Plans

  • Mining of Resources Such as Limestone, Coal, or Sand and Gravel

  • Construction In or Along Waterways

  • DEP NPDES Permitting

  • Industrial Discharge Permits

  • Asbetos Abatement Coordination

  • Solid Waste Management and Recycling facilities

  • Reclamation of strip-mined lands

  • Treatment of acid mine drainage

 

RAR Engineering stays in step with the ever-changing world of environmental laws and regulations. With RAR on your team, you will find that environmental permitting can be secured without delays to your project schedule.